Components

Heat Resistant Sheet

Check the inputs. Make a plan. Bring only what you still need.

Plan Heat Resistant Sheet →

Selected recipe · Furnace

The source rate is 30 Heat Resistant Sheet per minute. The table below converts each input rate into its theoretical cost per output item. Rates are reference ratios, not a promise about real-world completion time.

IngredientInput per minutePer output item
Wolfram Plate150.5
Titanium Sheet301
Glass150.5

Default source recipe: furnace:6. Other machine tiers and alternative recipes may use different proportions. This planner selects the first default source recipe for each output.

Compare included machine tiers

This snapshot includes 2 default machine recipes for Heat Resistant Sheet. Compare each recipe's direct input-to-output proportions below. The planner and every example on this page still use the first default recipe, Furnace; this table does not change that selection or optimize the dependency chain. Explicit alternative recipes are excluded, and these rows do not establish unlock requirements, discrete craft batches, construction costs, or completion times.

Included default recipes; material amounts are per output item.
MachineSource output/minDirect inputs per outputPlanner selection
Furnace
furnace:6
30Selected default
Furnace v.2
furnacetier2:heat_sheet_v2
60Reference only

See a worked StarRupture ratio and shared-inventory example.

Worked example: plan 10 Heat Resistant Sheet

With no inventory, the selected recipe chain expands to the terminal resources below. The plan contains 8 production steps. Theoretical amounts retain fractions; the gathering column rounds each resource up once. Real craft batches may need additional inputs.

Reference resource budget for 10 Heat Resistant Sheet, before inventory
Terminal resourceTheoretical amountRounded gathering amount
Calcium Ore1.6672
Helium-32.53
Titanium Ore55
Wolfram Ore2.53

Already have Heat Resistant Sheet or any of its intermediate parts? Open this target in the inventory-aware planner to calculate the remaining budget.

Show all 8 production steps in dependency order
Theoretical production quantities; dependencies come before the items that use them.
ProduceRemaining quantitySelected machine
Calcium Block1.667Smelter
Calcium Powder5Furnace
Titanium Bar5Smelter
Wolfram Bar2.5Smelter
Glass5Furnace
Titanium Sheet10Fabricator
Wolfram Plate5Fabricator
Heat Resistant Sheet10Furnace

Have intermediate parts in storage? Follow the Rotor inventory example to see how stock reduces upstream gathering.

What uses Heat Resistant Sheet?

The selected default recipes below directly consume Heat Resistant Sheet. Open an output item to inspect its complete dependency chain.

Before you build

The plan combines shared ingredient demand and consumes your inventory once across all targets. Enter any finished parts you already own before collecting raw materials. Rounded gathering quantities are an allowance over theoretical ratios; actual discrete craft batches may need additional supplies.

Dataset: Update 2 · Quality of Life · snapshot retrieved 2026-10-30. Source, version, and assumptions.