Components

Synthetic Silicon

Check the inputs. Make a plan. Bring only what you still need.

Plan Synthetic Silicon →

Selected recipe · Furnace

The source rate is 60 Synthetic Silicon per minute. The table below converts each input rate into its theoretical cost per output item. Rates are reference ratios, not a promise about real-world completion time.

IngredientInput per minutePer output item
Calcium Powder601
Helium-3300.5
Ceramics601

Default source recipe: furnace:7. Other machine tiers and alternative recipes may use different proportions. This planner selects the first default source recipe for each output.

Compare included machine tiers

This snapshot includes 2 default machine recipes for Synthetic Silicon. Compare each recipe's direct input-to-output proportions below. The planner and every example on this page still use the first default recipe, Furnace; this table does not change that selection or optimize the dependency chain. Explicit alternative recipes are excluded, and these rows do not establish unlock requirements, discrete craft batches, construction costs, or completion times.

Included default recipes; material amounts are per output item.
MachineSource output/minDirect inputs per outputPlanner selection
Furnace
furnace:7
60Selected default
Furnace v.2
furnacetier2:synthetic_silicon_v2
120Reference only

See a worked StarRupture ratio and shared-inventory example.

Worked example: plan 10 Synthetic Silicon

With no inventory, the selected recipe chain expands to the terminal resources below. The plan contains 7 production steps. Theoretical amounts retain fractions; the gathering column rounds each resource up once. Real craft batches may need additional inputs.

Reference resource budget for 10 Synthetic Silicon, before inventory
Terminal resourceTheoretical amountRounded gathering amount
Calcium Ore5.8336
Helium-355
Wolfram Ore1.6672

Already have Synthetic Silicon or any of its intermediate parts? Open this target in the inventory-aware planner to calculate the remaining budget.

Show all 7 production steps in dependency order
Theoretical production quantities; dependencies come before the items that use them.
ProduceRemaining quantitySelected machine
Calcium Block5.833Smelter
Wolfram Bar1.667Smelter
Calcite Sheets5Fabricator
Wolfram Powder5Furnace
Calcium Powder10Furnace
Ceramics10Furnace
Synthetic Silicon10Furnace

Have intermediate parts in storage? Follow the Rotor inventory example to see how stock reduces upstream gathering.

What uses Synthetic Silicon?

The selected default recipes below directly consume Synthetic Silicon. Open an output item to inspect its complete dependency chain.

Before you build

The plan combines shared ingredient demand and consumes your inventory once across all targets. Enter any finished parts you already own before collecting raw materials. Rounded gathering quantities are an allowance over theoretical ratios; actual discrete craft batches may need additional supplies.

Dataset: Update 2 · Quality of Life · snapshot retrieved 2026-10-30. Source, version, and assumptions.