The source rate is 30 Synthetic Resin per minute. The table below converts each input rate into its theoretical cost per output item. Rates are reference ratios, not a promise about real-world completion time.

IngredientInput per minutePer output item
Hardening Agent150.5
Sulphuric Acid301
Calcite Sheets903

Default source recipe: compounder:0. Other machine tiers and alternative recipes may use different proportions. This planner selects the first default source recipe for each output.

Compare included machine tiers

This snapshot includes 2 default machine recipes for Synthetic Resin. Compare each recipe's direct input-to-output proportions below. The planner and every example on this page still use the first default recipe, Compounder; this table does not change that selection or optimize the dependency chain. Explicit alternative recipes are excluded, and these rows do not establish unlock requirements, discrete craft batches, construction costs, or completion times.

Included default recipes; material amounts are per output item.
MachineSource output/minDirect inputs per outputPlanner selection
Compounder
compounder:0
30Selected default
Compounder v.2
synthetizertier2:3
60Reference only

See a worked StarRupture ratio and shared-inventory example.

Worked example: plan 10 Synthetic Resin

With no inventory, the selected recipe chain expands to the terminal resources below. The plan contains 17 production steps. Theoretical amounts retain fractions; the gathering column rounds each resource up once. Real craft batches may need additional inputs.

Reference resource budget for 10 Synthetic Resin, before inventory
Terminal resourceTheoretical amountRounded gathering amount
Calcium Ore20.20821
Helium-31010
Sulphur Ore4040
Titanium Ore2.8133
Wolfram Ore6.257

Already have Synthetic Resin or any of its intermediate parts? Open this target in the inventory-aware planner to calculate the remaining budget.

Show all 17 production steps in dependency order
Theoretical production quantities; dependencies come before the items that use them.
ProduceRemaining quantitySelected machine
Calcium Block20.208Smelter
Wolfram Bar6.25Smelter
Calcite Sheets33.75Fabricator
Wolfram Powder18.75Furnace
Calcium Powder10Furnace
Ceramics7.5Furnace
Titanium Bar2.813Smelter
Synthetic Silicon7.5Furnace
Titanium Rod1.875Fabricator
Titanium Sheet1.875Fabricator
Chemicals20Furnace
Glass2.5Furnace
Tube7.5Fabricator
Applicator2.5Fabricator
Sulphuric Acid20Pressurizer
Hardening Agent5Furnace
Synthetic Resin10Compounder

Have intermediate parts in storage? Follow the Rotor inventory example to see how stock reduces upstream gathering.

What uses Synthetic Resin?

The selected default recipes below directly consume Synthetic Resin. Open an output item to inspect its complete dependency chain.

Before you build

The plan combines shared ingredient demand and consumes your inventory once across all targets. Enter any finished parts you already own before collecting raw materials. Rounded gathering quantities are an allowance over theoretical ratios; actual discrete craft batches may need additional supplies.

Dataset: Update 2 · Quality of Life · snapshot retrieved 2026-10-30. Source, version, and assumptions.