Components

Condenser

Check the inputs. Make a plan. Bring only what you still need.

Plan Condenser →

Selected recipe · Assembler

The source rate is 5 Condenser per minute. The table below converts each input rate into its theoretical cost per output item. Rates are reference ratios, not a promise about real-world completion time.

IngredientInput per minutePer output item
Resonator51
Pump51
Nanofibre204

Default source recipe: assembler:5. Other machine tiers and alternative recipes may use different proportions. This planner selects the first default source recipe for each output.

Compare included machine tiers

This snapshot includes 2 default machine recipes for Condenser. Compare each recipe's direct input-to-output proportions below. The planner and every example on this page still use the first default recipe, Assembler; this table does not change that selection or optimize the dependency chain. Explicit alternative recipes are excluded, and these rows do not establish unlock requirements, discrete craft batches, construction costs, or completion times.

Included default recipes; material amounts are per output item.
MachineSource output/minDirect inputs per outputPlanner selection
Assembler
assembler:5
5Selected default
Constructorizer v.2
factorytier2:0
10Reference only

See a worked StarRupture ratio and shared-inventory example.

Worked example: plan 10 Condenser

With no inventory, the selected recipe chain expands to the terminal resources below. The plan contains 39 production steps. Theoretical amounts retain fractions; the gathering column rounds each resource up once. Real craft batches may need additional inputs.

Reference resource budget for 10 Condenser, before inventory
Terminal resourceTheoretical amountRounded gathering amount
Calcium Ore115115
Helium-3252.5253
Sulphur Ore410410
Titanium Ore694.375695
Wolfram Ore245.833246

Already have Condenser or any of its intermediate parts? Open this target in the inventory-aware planner to calculate the remaining budget.

Show all 39 production steps in dependency order
Theoretical production quantities; dependencies come before the items that use them.
ProduceRemaining quantitySelected machine
Calcium Block115Smelter
Wolfram Bar245.833Smelter
Calcite Sheets100Fabricator
Titanium Bar694.375Smelter
Wolfram Powder235Furnace
Calcium Powder195Furnace
Ceramics200Furnace
Titanium Beam180Fabricator
Titanium Rod336.25Fabricator
Titanium Sheet476.25Fabricator
Wolfram Wire265Fabricator
Glass65Furnace
Rotor80Fabricator
Synthetic Silicon130Furnace
Titanium Housing150Furnace
Tube385Fabricator
Wolfram Plate70Fabricator
Chemicals180Furnace
Heat Resistant Sheet80Furnace
Inductor70Furnace
Stabilizer40Fabricator
Stator70Fabricator
Applicator25Fabricator
Electronics30Furnace
Impeller30Mega Press
Sulphuric Acid180Pressurizer
Battery20Mega Press
Hardening Agent50Furnace
Nozzle20Mega Press
Pressurized Helium50Pressurizer
Turbine20Mega Press
Accumulator10Assembler
Generator10Assembler
Liquid Helium100Compounder
Valve10Mega Press
Nanofibre40Compounder
Pump10Mega Press
Resonator10Assembler
Condenser10Assembler

Have intermediate parts in storage? Follow the Rotor inventory example to see how stock reduces upstream gathering.

What uses Condenser?

The selected default recipes below directly consume Condenser. Open an output item to inspect its complete dependency chain.

Before you build

The plan combines shared ingredient demand and consumes your inventory once across all targets. Enter any finished parts you already own before collecting raw materials. Rounded gathering quantities are an allowance over theoretical ratios; actual discrete craft batches may need additional supplies.

Dataset: Update 2 · Quality of Life · snapshot retrieved 2026-10-30. Source, version, and assumptions.